Subject: FW: Report on TLR Level 5 Events of May 16 From: Kuebeck, Peter Sent: Wednesday, June 04, 2003 6:59 AM To: Walker, Robert M; Anderson, Kenneth; Fuller, Darrell; Golden, William; Mobly, Mark; Slayton, Gary Subject: FW: Report on TLR Level 5 Events of May 16 Bristow-Bluebell loading: Please review the provided link - a critical issue raised by this report is the necessity of going through level 5 until we have NNL assigned relief. Basically, CSWS impacts this flowgate, too. We don't ever.. Redispatch around this problem for them. They are causing it too, and we always need to go through level 5 to redispatch them. Please don't go moving the OG&E units around until we get the NNL relief assigned from SPP. Pete -----Original Message----- From: Wayne Galli [mailto:WGalli@SPP.ORG] Sent: Tuesday, June 03, 2003 11:25 AM To: dave.hilt@nerc.com Cc: Carl Monroe; Lanny Nickell; Ron Ciesiel; Larry Kezele (E-mail); Moore, Scott; drbozieo@aep.com; Perkins, Mel; Kuebeck, Pete Subject: Report on TLR Level 5 Events of May 16 Our report for the TLR Level 5 event that occurred on May 16 on the BluBriRivRed flowgate has been posted at ftp://TLRAuditUser:Br8_dOus@ftp2.spp.org/TLRAudit/TLR_Audit_May_16_03.pdf . Since this report contains sensitive information indicating locations of critical facilities in the SPP Region, we request that this report not be posted for public viewing on the NERC website. If it could be posted on the CRC site or some other similar site that is username/password protected, we would not object to posting. If you have any difficulty accessing the report or have any questions, please feel free to call me. Regards, Wayne Galli __________________________________________ A. Wayne Galli, P.E. Supervisor, Operations Engineering Southwest Power Pool Office: 501.614.3344 FAX: 501.664.1809 Text Page: 877-541-0241 --or-- 8775410214@airmessage.net >